


About the project
Execution of work to reroute water and sewer lines in order to clear the site for the construction of the Bartolomeu Park & Ride, a project of the Brașov City Hall. Polyethylene water pipes (D400), steel water pipes (DN1000), PVC domestic sewer systems (D500), and storm sewer networks made of corrugated pipe (D800). The work was carried out as a subcontractor, with the company responsible solely for construction.
Scope of works
- Rerouting of D400 polyethylene water pipes
- Rerouting of DN1000 steel water pipes
- Rerouting of D500 PVC domestic sewer lines
- Rerouting of D800 corrugated storm sewer lines


