Our services

Utility networks, specialist works, external works and industrial construction, in Brașov and across the county

Select a category to see the services it includes.

Where we work

We deliver work in the city of Brașov and in every town and village in the county, as well as in the neighbouring areas:

Brașov · Cristian · Ghimbav · Codlea · Râșnov · Zărnești · Săcele · Predeal · Bran · Sânpetru · Hărman · Prejmer

For larger projects we also travel outside the county.

Frequently asked questions

What clients most often ask us about connections, permits and building networks.

What documents do I need for a water connection in Brașov?

For a water connection in Brașov you need proof of ownership of the land or building, the urban planning certificate, the technical connection approval issued by the water operator, and the building permit from the local council. We handle the whole file: we prepare the documentation, obtain the approvals and execute the connection.

How long does a water connection or sewer connection take?

Excavation, installation and pressure testing for a standard domestic water connection generally take one to two working days. The overall lead time, from the first discussion to commissioning, is driven by permits: the urban planning certificate and the technical connection approval usually take three to six weeks. A sewer connection takes the same time to execute but requires extra care with the gradient and the frost depth.

What is a utility network diversion and when is it needed?

A diversion means moving an existing pipeline off the footprint of a new development so the site can be built on. It comes up on almost any residential scheme, industrial hall or road crossed by a water main, a sewer collector or a cable. It is high-risk work, because the network has to stay in service for the consumers connected to it. We carry out diversions on large-diameter water mains, polyethylene up to D400 and steel up to DN1000, and on PVC D500 and corrugated D800 sewer networks.

Do you build water and sewer networks for residential schemes and industrial parks?

Yes, it is the company's core specialism. We build external potable water distribution networks, foul and storm sewer networks, pumping and pressure-boosting stations, retention basins, buried reservoirs, hydrocarbon separators and external fire-fighting mains, for residential schemes, hotels, industrial parks and public projects across Brașov county.

Do you build turnkey steel-frame industrial halls?

Yes. We cover the full cycle: design, permitting, foundations, steel structure, sandwich-panel cladding and the associated internal services — electrical, water, sewerage, changing rooms and sanitary facilities. We build production and storage halls, sports halls and other steel-frame buildings. For an industrial project we can deliver the external networks and access platforms under the same contract, which shortens the programme.

Which areas do you cover?

We work across Brașov county: Brașov, Cristian, Ghimbav, Codlea, Râșnov, Zărnești, Săcele, Predeal, Bran, Sânpetru, Hărman, Prejmer, Bod, Feldioara, Hălchiu, Tărlungeni, Vulcan, Făgăraș, Victoria and Rupea, as well as the neighbouring parts of the adjoining counties. For larger projects we also travel outside the county.

How is the price of a network project established?

The price is built up from a bill of quantities, not from a fixed rate. It depends on the length and diameter of the pipe, the laying depth, the ground conditions — soil, rock or restricted access — the breaking out and reinstatement of the road, and the number of chambers. For an accurate estimate we need the site plan or the urban planning certificate. Quotations are free and without obligation.

Can't find the service you need?

Tell us what you need built or refurbished and we will confirm whether we can take it on.

Request a free quote
Message us on WhatsAppCall now