


About the project
Construction of stormwater drainage works on Mori Street in the village of Cristian. The project involved the installation of a corrugated pipe stormwater collector, over which a sidewalk was built to ensure pedestrian safety. The work included utility networks, restoration of the earthworks, and paving of the sidewalk.
Scope of works
- Installation of a storm drain (corrugated pipe)
- Construction of a pedestrian sidewalk
- Public utility network work
- Earthwork restoration
- Sidewalk paving




