


About the project
Construction of a pressure-boosting station to supply drinking water to the Doroboiu neighborhood in the municipality of Cristian. The project included the construction of an underground reinforced concrete chamber equipped with a pumping unit to ensure the necessary pressure in the drinking water distribution network.
Scope of works
- Construction of a reinforced concrete underground chamber
- Installation of a drinking water pump station
- Work to supply and connect to the existing water network

